X
Boker Magnum Long Lead EDC Folding Pocket Knife
Boker Magnum Long Lead EDC Folding Pocket Knife
Boker Magnum Long Lead EDC Folding Pocket Knife

Boker Magnum Long Lead EDC Folding Pocket Knife 01SC080, Multi

Product ID : 47634942
5 out of 5 stars


Galleon Product ID 47634942
UPC / ISBN 788857750346
Shipping Weight 0.41 lbs
I think this is wrong?
Model 01SC080
Manufacturer Boker
Shipping Dimension 5.79 x 2.6 x 1.1 inches
I think this is wrong?
-
2,918

*Price and Stocks may change without prior notice
*Packaging of actual item may differ from photo shown
  • Electrical items MAY be 110 volts.
  • 7 Day Return Policy
  • All products are genuine and original
  • Cash On Delivery/Cash Upon Pickup Available

Pay with

Boker Magnum Long Lead EDC Folding Pocket Knife Features

  • Overall Length: 7,24 in

  • Blade Length: 3,15 in

  • Blade Material: 8Cr13MoV

  • Handle Material: G10

  • Color: Black


About Boker Magnum Long Lead EDC Folding Pocket Knife

The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).