All Categories
Get it between 2025-01-14 to 2025-01-21. Additional 3 business days for provincial shipping.
【Control Valve Dump Pump】The valve is installed in the driver's cab to control the lifting, intermediate stop, and lowering of the oil cylinder. The valve has a controlled lowering (feathering) design, eliminating rapid lowering.
【PTO Control Switch】The valve has four working positions: lifting, intermediate stop, descending and PTO. When the Vehicle body is lowered, the PTO automatically disengages and includes warning lights for safe operation.
【Parameter】Connecting air pipe: OD6mm, Working pressure: 50-145 PSI, Working temperature: -25 - 80 °C. The concole tower adopts spray coating surface treatment. Good anti-corrosion performance.
【Valve Air Kit for Tipper】This air valve kit covers the basic elements of starting a control valve installation.
【Combinations】Different matching combinations. You can pick and choose the parts you need.