All Categories
Get it between 2024-11-26 to 2024-12-03. Additional 3 business days for provincial shipping.
PREMIUM BRASS: Made of high quality brass, the motorized ball valve is and reliable.
BUILT-IN ACTUATOR: Built-in actuator de-energize the brass valve when closed, which is and energy-saving.
SPACE SAVING: The 3 ways ball valve little external space and can be installed on the wall.
ADVANTAGES: Through workmanship, the electrical ball valve has precision structure, which is tight close and no leakage.
MAIN USAGE: The air conditioner ball valve is mainly used for the fan coil and water control system of air conditioner.
Specification: Model: DN25 3 Wire 2 Control Material: Brass, 304 Stainless Steel, Special Rubber Driver Operating Voltage: DC24V Power Consumption: 7.5VA Valve Body Pressure: 1.6Mpa Allowable Pressure: 0.13Mpa Applicable Medium Temperature: 2-95 Applicable Environment Temperature: 0-60 Package List: 1 * Motorized Ball Valve Installation and Commissioning: 1. Please read the instructions before using, and installed by professionals. 2. direction must be the same as the direction of the arrow on the valve body. 3. The valve body must be located the fan water tray, to ensure that the drip drop into the water tray. 4. Valve body and driver must be installed in the vertical direction ±60° range, should have at least 30mm space . 5. Two and more than two of the electric valve can not be parallel, if the need for parallel relays to be separated. 6. The valve body is installed and the pipeline through the test pressure before installing the drive. 7. If the driver has been installed on the body, then during the installation and commissioning it must not force on the drive, otherwise it will damage the drive. 8. Drive can not be wrapped with insulation material 9. Drives must be reliable grounded by conductors not less than 1.5mm, other lines shall conform to the relevant standards of electrician. 10. After installation and check it correct, do not water-energized commissioning. Please observe the three full operating cycles of the drive to determine for a minute if the parts are normal and correct. 11. After the water- commissioning, then start the water commissioning.