X
EEEEE (20 Types) 301 pcs Long Lead 5mm LED kit and
EEEEE (20 Types) 301 pcs Long Lead 5mm LED kit and
EEEEE (20 Types) 301 pcs Long Lead 5mm LED kit and
EEEEE (20 Types) 301 pcs Long Lead 5mm LED kit and
EEEEE (20 Types) 301 pcs Long Lead 5mm LED kit and
EEEEE (20 Types) 301 pcs Long Lead 5mm LED kit and
EEEEE (20 Types) 301 pcs Long Lead 5mm LED kit and
EEEEE (20 Types) 301 pcs Long Lead 5mm LED kit and

EEEEE (20 Types) 301 pcs Long Lead 5mm LED kit and LED diode Lights Emitting Diode LED Assortment Kit for Tiny Small led and Single led Light led 5mm led Lights led diode Lights diode led

Product ID : 54930129


Galleon Product ID 54930129
Shipping Weight 0.46 lbs
I think this is wrong?
Model EE914A
Manufacturer EEEEE
Shipping Dimension 8.27 x 6.69 x 0.75 inches
I think this is wrong?
-
1,245

*Price and Stocks may change without prior notice
*Packaging of actual item may differ from photo shown
  • Electrical items MAY be 110 volts.
  • 7 Day Return Policy
  • All products are genuine and original
  • Cash On Delivery/Cash Upon Pickup Available

Pay with

EEEEE (20 Types) 301 pcs Long Lead 5mm LED kit and Features

  • ⭕️ 20 Types Long lead LEDs, 20 individual compartments with lids and labels

  • 🟢 8 different colors (Pink Violet Red Green Yellow Blue Orange White) with Both Diffused and Clear Options

  • 🔴 Flashing RED LED, DUAL Color LED( RED/YELLOW, RED/GREEEN, GREEN/BLUE)

  • 🔵 Multi color LED (Tri-Color RGB led)

  • 🟣 WS2812 RGB LED BAR (8 leds in a row)


About EEEEE (20 Types) 301 Pcs Long Lead 5mm LED Kit And